WASTE HEAT RECOVERY (WHR) COMPLETE ENGINEERING FOR GEOTHERMAL

Dr. Shimin Xiang

As the core team member of the Dr. Feng Lin, he specialized mainly on the study of geothermal reservoir engineering for 8 years. He has been studying and working in 8 countries. As a project manager has been participating on more than 100 geothermal projects in Asia, Africa and Europe. Active at some important projects such as Turkey Manisa Geothermal power plant having installed capacity of 700MWe); Geothermal power and heating in Gostynin and Wielun (Poland); Geothermal step utilization in ChangBaShan (China).